Move-in covers everything from the signed contract to a settled home — including the handover and the warranty years after it.

Between signature and move-in there are usually months of silence. Move-in fills them: a personal schedule with every date and deadline, a digital room-by-room handover protocol with meter readings and signatures, and afterwards a defect file that keeps track of warranty deadlines by itself. Everything captured at handover is simply already there later, in daily operations.

A move-in that's guided instead of chaotic — and a handover that holds up legally.

The modules

3 of 5 modules are live. Each has its own page with functions, use and audience.

Integrations

Move-in connects to the systems you already run — each connector has its own page.

All integrations